Brochure | Contact Us | How to Order | Client Referrals   
Home About Us Products Quality Control Certifications Case Studies
        
  
  
Products
  
Engineered Wood Flooring
  
Solid Wood Flooring
 ·Production Procedure
  
 ·Installation
  
Laminate Flooring
  
WPC Decking
  
Vinyl Flooring
  
Flooring Accessories
  
  
  
  
Brochure
  
PDF download

You need Adobe Acrobat Reader to view this PDF file.
  
 
Home > Product > Solid Wood Flooring > Production Procedure
  
  


Our production process is ISO certified

Drying (click picture to enlarge)

picture 1

1. Stacking and breathing period.
2. Kiln drying at constant temperature for about 20 days. (See picture 1, left)
3. Dry shedding for 10-20 days.
4. Selecting and marking.


Milling and Sizing (click pictures to enlarge)

picture 2 picture 3

1. Milling. (See picture 2, above)
2. Selecting and marking planks. (See picture 3, above)
3. Sawing selected planks.
4. Sorting by sizes and selecting top face.

Fine Machining (click pictures to enlarge)

picture 4 picture 5 picture 6

1. Sanding top face. (See picture 4, above)
2. Four side plaining. (See picture 5, above)
3. Machining tongues and grooves. (See picture 6, above)

Effecting Repairs (click picture to enlarge)

picture 7

1. Filling with putty. (See picture 7, above)
2. UV drying.
3. Sanding.

Varnishing (UV Lacquer) (click pictures to enlarge)

picture 8 picture 9 picture 10

Back Face
1. Sanding.
2. Coating - drying.

Top Face
1. Sealer and putty layers.
2. Sanding.
3. First and second coating - drying.
4. Third and fourth coating - drying.
5. Sanding.
6. Fifth and sixth coating - drying.
7. Sanding.
8. Seventh and eighth coating - drying.

Varnish Inspection

Packaging (click pictures to enlarge)

picture 11 picture 12 picture 13

1. Printing and marking cartons with client's logo.
2. Placing expanded polystyrene sheets between planks' top faces.
3. Wrapping planks in plastic. (See picture 11, above)
4. Placing planks into cartons. (See picture 12, above)
5. Placing cartons onto pallets.
6. Sealing pallets with plastic film.
7. Securing pallets with metal strips. (See picture 13, above)

Warehousing (click pictures to enlarge)

picture 14

Marking, stocking and placing pallets in the warehouse, under appropriate environmental conditions. (See picture 14, left)

 

 

Delivering to Harbour (click pictures to enlarge)

picture 15

Our containers are truck or train driven to harbour for shipment. (See picture 15, left)






  
  Copyright © 2013 China Link. All rights reserved.